Fleet · July 2026
Performance insights
A single view of generation, revenue and exceptions across every Infinis site. One click below turns this month's numbers into a fully written owner pack for 3i.
Generation
98.6 GWh
+3.4% vs plan
Revenue
£7.98m
+17% vs June
Availability
94.3%
+1.5pts vs June
Unplanned trips
4
2 material events
Generation vs plan
GWh · fleet · last 6 monthsWhy this moved: Up 3.4% vs plan because Packington ran a full month after its April outage and Willey solar delivered above P50 in the heatwave.
Narrative
Auto-written from this month's data.
- Fleet generated 98.6 GWh in July, +3.4% vs plan and the strongest month in the last six.
- Revenue landed at £7.98m, up from £6.82m in June. The uplift is driven by higher availability at Packington, Willey solar and Rassau reserve dispatch.
- Widnes remains the weakest landfill site at 88.7% availability. Cylinder 4 EGT drift on E2 accounts for 0.42 GWh of lost output.
- One unplanned trip at Brookhurst E3 on Jul 14 cost 0.61 GWh. Root cause: gas train pressure switch. Fix deployed.
- Newton Green natural gas engine E1 failed to start on Jul 18 (starter motor). Repaired within 6 hours.
- Recommend prioritising a Widnes E2 top-end overhaul in the August window while landfill gas flow is seasonally lower.
Availability by site
% · all fuelsWhy this moved: Fleet average 94.3% (+1.5 pts vs June). Battery and solar carried the uplift while Widnes dragged the landfill average down.
Engine exceptions
Widnes · E2
−0.42 GWhCylinder 4 EGT drift
Calvert · E1
−0.18 GWhOil pressure trending low
Brookhurst · E3
−0.61 GWhUnplanned trip on Jul 14
Willey · INV-07
−0.14 GWhString underperforming (soiling)
Newton Green · E1
−0.35 GWhStart failure on Jul 18
Trecwn · BAT-A
−0.09 GWhSoC calibration drift, flexibility revenue at risk
Rassau Reserve · RES-1
−0.05 GWhStandby readiness test overdue